Key Data Set Information
|
Location
|
ZB-SD-CN
|
Geographical representativeness description
|
The polluted site is located in Zibo City, Shandong Province, covering a total area of approximately 87800 m2.
|
Reference year
|
2024
|
Name
|
Excavation soil ; 3~10 m ; Soil ex-situ remediation ; Excavation and transportation ; Including enclosed shed construction
|
Use advice for data set
| This dataset should be used in the context of environmental impact assessments for soil remediation projects. Special attention should be given to the indicated depth of soil excavation, as the energy consumption and material usage will vary depending on the specific depth and volume of contaminated soil addressed. Users must account for the transportation and production of materials for foundation pit support and include the energy consumption for the operation of excavation and transportation equipment in their environmental impact calculations. |
Technical purpose of product or process
| The remediation process described pertains to the excavation and ex-situ remediation of contaminated soil within a depth of 3 to 10 meters. It is typically applicable for environmental restoration projects, especially for treating polluted sites like the one in Zibo City, Shandong Province. The process uses excavators and transport vehicles for moving the soil and employs concrete cast-in-place piles, crown beams, and anchor cables for foundational pit support. |
Classification
|
Class name
:
Hierarchy level
|
| Excavate contaminated soil at a depth of 3-10 meters, and transport it to a enclosed shed on site. |
Copyright
|
No
|
Owner of data set
|
|
Quantitative reference
|
Reference flow(s)
| |
Functional Unit
|
Excavation of 59922m3 contaminated soil. Using concrete cast-in-place piles, crown beams, and anchor cables for foundation pit support
|
Technological representativeness
|
Technology description including background system
| Using excavators and transport vehicles, excavate and transport 59922m3 of contaminated soil to a enclosed shed. Excavation process using foundation pit support |