Close Go back Collapse all sections
Process Data set: Dried fish products ; Fresh fish ; Fresh dried/boil drying, dried with salt, dried with seasoning ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Dried fish products ; Fresh fish ; Fresh dried/boil drying, dried with salt, dried with seasoning ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 该数据集涉及干鱼制品的工业加工,新鲜鱼经过不同的保存方法,包括风干、煮干、腌制和调味。详细说明的尾端处理技术用于处理废水污染物,如氨氮、化学需氧量、有机结合氮和总磷,适用于各种规模的生产设施。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Materials production / Food and renewable raw materials
General comment on data set the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID b4f8a0fa-528c-4d48-9a92-d757832313e4
Date of last revision 2024-04-15T22:09:45.256124+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=b4f8a0fa-528c-4d48-9a92-d757832313e4&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Food and renewable raw materials 1000.0 kg1000.0 kg
General comment nan
0.08416 0.08416
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
99000.0 99000.0
General comment the Technical of end-of-pipe management technology for pollution Waste wateris/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.8416 0.8416
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.8416 0.8416
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + SBR,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
1.052 1.052
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management75,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.27785 kg1.27785 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
3.3664 3.3664
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
3.7872 3.7872
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
4.208 4.208
General comment the Technical of end-of-pipe management technology for pollution Ammonia Nitrogenis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours) / normal production time (hours)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 4.2595 kg4.2595 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 4.2595 kg4.2595 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 4.2595 kg4.2595 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + SBR,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 4.94208 kg4.94208 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 5.1114 kg5.1114 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 6.0795900000000005 kg6.0795900000000005 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management77,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 7.6671000000000005 kg7.6671000000000005 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 7.9299 kg7.9299 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management70,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 8.519 kg8.519 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 10.573200000000002 kg10.573200000000002 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 10.573200000000002 kg10.573200000000002 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + SBR,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 21.146400000000003 kg21.146400000000003 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 23.7897 kg23.7897 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 26.433 kg26.433 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 37.065599999999996 kg37.065599999999996 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 37.065599999999996 kg37.065599999999996 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 37.065599999999996 kg37.065599999999996 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + SBR,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 148.26239999999999 kg148.26239999999999 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 197.68320000000003 kg197.68320000000003 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPrecipitation separation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 247.104 kg247.104 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)