Process Data set: Domestic sewage treatment station ; Bituminous coal and anthracite coal ; Bituminous coal and anthracite coal ; Underground mining ; 1.2~10 million t/a; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Domestic sewage treatment station ; Bituminous coal and anthracite coal ; Bituminous coal and anthracite coal ; Underground mining ; 1.2~10 million t/a; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 该数据集代表了烟煤和无烟煤的井下开采以及生活污水处理站的运营。烟煤和无烟煤的开采能力为每年120万至1000万吨,可能被用作发电和需要高品质煤炭的各种工业的燃料来源。生活污水处理站采用物理化学处理结合好氧生物处理来管理废水中的污染物,如氨氮、悬浮固体和化学需氧量(COD),保持淡水资源的完整性。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Energy carriers and technologies / Hard coal based fuels
General comment on data set the Technical of end-of-pipe management technology for pollution chemical oxygen demandisAerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution chemical oxygen demandisAerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID ba191296-5886-4868-b78c-46b8943a35c5
Date of last revision 2024-04-15T22:09:52.551233+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=ba191296-5886-4868-b78c-46b8943a35c5&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Raw materials 1000.0 kg1000.0 kg
General comment nan

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
95.2 95.2
General comment the treatment technology for the pollution of Waste waterdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
2.301E-4 2.301E-4
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPhysicochemical treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management87,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
3.009E-4 3.009E-4
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisAerobic biological treatment,Its Technical efficiency of end-of-pipe management83,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 9.9E-4 kg9.9E-4 kg
General comment the Technical of end-of-pipe management technology for pollution Suspended solids, unspecifiedisPhysicochemical treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management91,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.0013000000000000002 kg0.0013000000000000002 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPhysicochemical treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.00132 kg0.00132 kg
General comment the Technical of end-of-pipe management technology for pollution Suspended solids, unspecifiedisAerobic biological treatment,Its Technical efficiency of end-of-pipe management88,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.00195 kg0.00195 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisAerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours/year) / normal production time (hours/year)