| Data set information | |
| Name | Equipment and Materials Arriving on Site |
| Classification |
Class name
:
Hierarchy level
No records found. |
| General comment | Equipment and materials transported to the soil or groundwater remediation site, such as drilling rigs, concrete, quartz sand, PVC pipe, steel, pumps, tanks, etc. |
| Quantitative reference | |
| Reference Flow Property | |
| LCI method | |
| Type of flow | Product flow |
| Data entry by | |
| Time stamp (last saved) | 2024-04-16T19:00:22.628761+08:00 |
| Data set format(s) | |
| Publication and ownership | |
| UUID | e8bba15b-3887-430e-80b6-9c6a640016f0 |
| Data set version | 00.01.005 |
| Flow Property | Mean value | Minimum value | Maximum value | Uncertainty distribution type | Relative StdDev in % | Data derivation type / status | General comment |
|---|---|---|---|---|---|---|---|
| 1.0 | 0.0 | 0.0 | 0.0 % |