Close Go back Collapse all sections
Process Data set: Polyvinyl Alcohol High Strength High Modulus Fibers ; Polyvinyl alcohol ; Dope preparation - spinning - heat treatment - post treatment ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Polyvinyl Alcohol High Strength High Modulus Fibers ; Polyvinyl alcohol ; Dope preparation - spinning - heat treatment - post treatment ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 本数据集描述的聚乙烯醇高强高模纤维用于生产高性能材料,如用于加固复合材料、纺织品和各种工业应用中需要特殊抗拉强度和模量的材料。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Materials production / Organic chemicals
General comment on data set the treatment technology for the pollution of Exhaust gasdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the treatment technology for the pollution of Exhaust gasdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 1cf35df3-e506-4a93-9272-a9ff1a83d4d4
Date of last revision 2024-04-15T22:03:49.399895+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=1cf35df3-e506-4a93-9272-a9ff1a83d4d4&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 4.9000000000000005E-5 kg4.9000000000000005E-5 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment + physicochemical treatment,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 8.82E-5 kg8.82E-5 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management82,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Product flow
Materials production / Plastics 1000.0 kg1000.0 kg
General comment nan
Product flow
Emissions / Other substance type 0.00462 kg0.00462 kg
General comment the Technical of end-of-pipe management technology for pollution Petroleum-related wasteisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment + physicochemical treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Product flow
Emissions / Other substance type 0.01078 kg0.01078 kg
General comment the Technical of end-of-pipe management technology for pollution Petroleum-related wasteisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management65,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.0342228 kg0.0342228 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisAdsorption + steam desorption,Its Technical efficiency of end-of-pipe management62,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.0342228 kg0.0342228 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisDirect combustion,Its Technical efficiency of end-of-pipe management62,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
55200.0 55200.0
General comment the treatment technology for the pollution of Waste waterdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.0612408 kg0.0612408 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisAbsorption + diversion,Its Technical efficiency of end-of-pipe management32,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.1966 kg0.1966 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment + physicochemical treatment,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.2949 kg0.2949 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
0.3597 0.3597
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment + physicochemical treatment,Its Technical efficiency of end-of-pipe management78,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
0.39239999999999997 0.39239999999999997
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management76,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.944 kg1.944 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment + physicochemical treatment,Its Technical efficiency of end-of-pipe management97,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 6.48 kg6.48 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPhysicochemical treatment + anaerobic biological treatment + aerobic biological treatment,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)
Product flow
Materials production / Inorganic chemicals 60500.0 m360500.0 m3
General comment the treatment technology for the pollution of Exhaust gasdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = operating time of wastewater treatment facilities (days/year) / production time (days/year)