Name
Electrostatic coating ; Fitness equipment ; Plastic powder ; Electrostatic coating ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 该数据集代表各种规模健身器材的塑粉静电喷涂工艺。数据用于描述尾气管理技术(如布袋过滤器、管式过滤、多管旋风除尘和静电沉降)的应用,这些技术专门设计用于处理废气和从PM2.5到PM10的微粒物质。这些技术对于制造设施维持空气质量标准至关重要。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Systems / Paints and chemical preparations
General comment on data set the Technical of end-of-pipe management technology for pollution Exhaust gasis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = annual power consumption of wastewater treatment facilities (kWh) / (total rated power (kW) × annual operating time (hours))
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution Exhaust gasis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = annual power consumption of wastewater treatment facilities (kWh) / (total rated power (kW) × annual operating time (hours))
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 28689db8-5b37-407b-a7e0-e2a631a31452
Date of last revision 2024-04-15T22:04:18.633858+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=28689db8-5b37-407b-a7e0-e2a631a31452&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Other mineralic materials 1000.0 kg1000.0 kg
General comment nan

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.208 kg0.208 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isBag filter,Its Technical efficiency of end-of-pipe management99,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = annual power consumption of wastewater treatment facilities (kWh) / (total rated power (kW) × annual operating time (hours))
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 1.04 kg1.04 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isElectrostatic precipitation,Its Technical efficiency of end-of-pipe management95,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 2.08 kg2.08 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isTubular filtration,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 3.12 kg3.12 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isMulti-tube cyclone dust removal,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Product flow
Materials production / Inorganic chemicals 114000.0 m3114000.0 m3
General comment the Technical of end-of-pipe management technology for pollution Exhaust gasis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = annual power consumption of wastewater treatment facilities (kWh) / (total rated power (kW) × annual operating time (hours))