Close Go back Collapse all sections
Process Data set: Large Bus ; Scrap steel, waste batteries, waste non-ferrous metals, waste plastics, waste glass, waste tires, waste fiber ; Cutting ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Large Bus ; Scrap steel, waste batteries, waste non-ferrous metals, waste plastics, waste glass, waste tires, waste fiber ; Cutting ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 所提供的工业过程涉及大型客车的各种废物的回收或处理,包括废钢铁、废电池、废有色金属、废塑料、废玻璃、废轮胎和废纤维。该过程包括所有规模的废料切割,并涉及端部排放管理技术以控制 PM2.5 到 PM10 范围内的污染颗粒。产出可能包括准备好用于建筑、汽车、电池生产和塑料制造等各种行业的再生或回收材料。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / End-of-life treatment / Material recycling
General comment on data set the Technical of end-of-pipe management technology for pollution Scrap Steelis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = power consumption of wastewater treatment facilities (kWh/year) / operating time of wastewater treatment facilities (hours/year) / total power of wastewater treatment facilities (kW)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution Scrap Steelis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = power consumption of wastewater treatment facilities (kWh/year) / operating time of wastewater treatment facilities (hours/year) / total power of wastewater treatment facilities (kW)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 3cc5e17d-c396-440b-b661-ae2774dac563
Date of last revision 2024-04-15T22:04:51.401837+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=3cc5e17d-c396-440b-b661-ae2774dac563&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Metals and semimetals 1000.0 kg1000.0 kg
General comment nan

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 4.0E-4 kg4.0E-4 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)is/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = power consumption of wastewater treatment facilities (kWh/year) / operating time of wastewater treatment facilities (hours/year) / total power of wastewater treatment facilities (kW)