Process Data set: Surimi ; Fresh fish ; Surimi production ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Surimi ; Fresh fish ; Surimi production ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 所描述的鱼糜生产过程涉及将新鲜鱼肉转换为鱼糜,可在所有生产规模中使用。在此过程中生产的货物适用于各种烹饪用途,通常作为某些海鲜菜肴的成分或替代品。所述的尾端处理技术,如化学混凝、A2/O工艺、浮选分离、SBR(序批式反应器)、生物接触氧化和好氧生物处理,用于处理鱼糜生产过程中产生的废水中的污染物,如氨氮、化学需氧量、总磷和有机结合氮。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Materials production / Food and renewable raw materials
General comment on data set the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 53233d21-5da3-48a2-9ea7-861ca21fe7c9
Date of last revision 2024-04-15T22:05:34.756105+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=53233d21-5da3-48a2-9ea7-861ca21fe7c9&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Food and renewable raw materials 1000.0 kg1000.0 kg
General comment nan
0.0055 0.0055
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.055 0.055
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.055 0.055
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + SBR,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.06875 0.06875
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management75,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.0945 kg0.0945 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.22 0.22
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.2475 0.2475
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
0.275 0.275
General comment the Technical of end-of-pipe management technology for pollution Ammonia Nitrogenis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.315 kg0.315 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.315 kg0.315 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.315 kg0.315 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + SBR,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.378 kg0.378 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.5670000000000001 kg0.5670000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.63 kg0.63 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.8349 kg0.8349 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management77,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.089 kg1.089 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management70,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.452 kg1.452 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.452 kg1.452 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + SBR,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 2.904 kg2.904 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.267 kg3.267 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.27414 kg3.27414 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.63 kg3.63 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 24.55605 kg24.55605 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 24.55605 kg24.55605 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 24.55605 kg24.55605 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + SBR,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 98.2242 kg98.2242 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 130.9656 kg130.9656 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPrecipitation separation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 163.707 kg163.707 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)