Close Go back Collapse all sections
Process Data set: Rubber shoes ; Rubber (including various types of rubber materials, additives, natural rubber, etc.), combined cloth (rubber/textile materials) ; Vulcanization process ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Rubber shoes ; Rubber (including various types of rubber materials, additives, natural rubber, etc.), combined cloth (rubber/textile materials) ; Vulcanization process ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 所描述的工业过程用于生产橡胶鞋,包括与布料(橡胶/纺织材料)结合的橡胶(包括各种橡胶材料、添加剂、天然橡胶等)的硫化过程。该过程适用于鞋类制造行业内所有生产规模。此外,该过程包括针对挥发性有机化合物(VOCs)和颗粒物(PM2.5 - PM10)的各种尾气污染管理技术,包括吸附方法、光催化、光解、低温等离子、催化燃烧,以及旋风除尘和袋式过滤器。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Materials production / Other materials
General comment on data set the Technical of end-of-pipe management technology for pollution volatile organic compoundisDirect discharge,Its Technical efficiency of end-of-pipe management0,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution volatile organic compoundisDirect discharge,Its Technical efficiency of end-of-pipe management0,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 95f14e29-7c8a-4adc-bcfe-4b76eb216c56
Date of last revision 2024-04-15T22:08:16.374422+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=95f14e29-7c8a-4adc-bcfe-4b76eb216c56&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Other materials 1.0 Item(s)1.0 Item(s)
General comment nan
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 2.725E-4 kg2.725E-4 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isCyclone dust removal + bag filter,Its Technical efficiency of end-of-pipe management95,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / production days (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 5.45E-4 kg5.45E-4 kg
General comment the Technical of end-of-pipe management technology for pollution particles (PM2.5 - PM10)isBag filter,Its Technical efficiency of end-of-pipe management90,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / production days (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00332 kg0.00332 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisOthers (adsorption method + photolysis),Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / number of days of pressing (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.004565 kg0.004565 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisAdsorption/catalytic combustion method,Its Technical efficiency of end-of-pipe management45,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00498 kg0.00498 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisCatalytic combustion method,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00498 kg0.00498 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisOthers (spray tower + photolysis),Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.005395 kg0.005395 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisPhotolysis,Its Technical efficiency of end-of-pipe management35,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / number of days of pressing (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00664 kg0.00664 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisLow temperature plasma,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / number of days of pressing (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00664 kg0.00664 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisOthers (adsorption),Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00664 kg0.00664 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisPhotocatalysis,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of wastewater treatment facilities (days/year) / number of days of pressing (days/year)
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.00747 kg0.00747 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisOthers (spray tower),Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to air / Emissions to air, unspecified 0.0083 kg0.0083 kg
General comment the Technical of end-of-pipe management technology for pollution volatile organic compoundisDirect discharge,Its Technical efficiency of end-of-pipe management0,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /