Close Go back Collapse all sections
Process Data set: Fish oil ; Fresh fish ; Mixing and refining process ; All sizes; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Fish oil ; Fresh fish ; Mixing and refining process ; All sizes; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 通过适用于各种规模的鲜鱼混合和精炼工艺得到的鱼油主要用于生产膳食补充剂、药品和强化食品。所述的末端处理技术被用于各种行业的废水处理,以减少氨氮、化学需氧量(COD)、总磷和有机结合氮等污染物。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Materials production / Organic chemicals
General comment on data set the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID 98837414-d6e5-4818-bfa8-c31d4abe36e4
Date of last revision 2024-04-15T22:08:22.214545+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=98837414-d6e5-4818-bfa8-c31d4abe36e4&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
1000.0 1000.0
General comment the Technical of end-of-pipe management technology for pollution Waste wateris/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Product flow
Materials production / Organic chemicals 1000.0 kg1000.0 kg
General comment nan
0.00942 0.00942
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours) / normal production time (hours)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.030600000000000002 kg0.030600000000000002 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
0.0942 0.0942
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (hours) / normal production time (hours)
0.0942 0.0942
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisFloating separation + SBR,Its Technical efficiency of end-of-pipe management80,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.10200000000000001 kg0.10200000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.10200000000000001 kg0.10200000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.10200000000000001 kg0.10200000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisFloating separation + SBR,Its Technical efficiency of end-of-pipe management50,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
0.11775000000000001 0.11775000000000001
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management75,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.12240000000000001 kg0.12240000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.18359999999999999 kg0.18359999999999999 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.20400000000000001 kg0.20400000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution phosphorus, totalis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.23483 kg0.23483 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management77,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.3063 kg0.3063 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management70,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.3768 0.3768
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.4084 kg0.4084 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.4084 kg0.4084 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisFloating separation + SBR,Its Technical efficiency of end-of-pipe management60,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.41758 kg0.41758 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation + A2/O process,Its Technical efficiency of end-of-pipe management98,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
0.4239 0.4239
General comment the Technical of end-of-pipe management technology for pollution Ammonia NitrogenisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
0.47100000000000003 0.47100000000000003
General comment the Technical of end-of-pipe management technology for pollution Ammonia Nitrogenis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.8168 kg0.8168 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisChemical coagulation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.9189 kg0.9189 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundisPrecipitation separation,Its Technical efficiency of end-of-pipe management10,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 1.0210000000000001 kg1.0210000000000001 kg
General comment the Technical of end-of-pipe management technology for pollution Nitrogen, organic boundis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is /
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.13185 kg3.13185 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisBio-contact oxidation process,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.13185 kg3.13185 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + aerobic biological treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 3.13185 kg3.13185 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisFloating separation + SBR,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 12.5274 kg12.5274 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisChemical coagulation,Its Technical efficiency of end-of-pipe management40,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 16.703200000000002 kg16.703200000000002 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPrecipitation separation,Its Technical efficiency of end-of-pipe management20,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 20.879 kg20.879 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandis/,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = opreating time of treatment facilities (days) / normal production time (days)