Process Data set: Mine water treatment plant ; Bituminous coal and anthracite coal ; Bituminous coal and anthracite coal ; Underground synthetic mechanization mining ; 1.2~10 million t/a ; High rich water mining area; NESPS2 (en) en zh

Key Data Set Information
Location CN
Reference year 2019
Name
Mine water treatment plant ; Bituminous coal and anthracite coal ; Bituminous coal and anthracite coal ; Underground synthetic mechanization mining ; 1.2~10 million t/a ; High rich water mining area; NESPS2
Use advice for data set This dataset is derived from the Pollution Source Census Report and contains information on pollution emissions and related products. However, it does not include data on energy or chemical consumption, nor does it provide information on waste or co-product generation. When utilizing this dataset, please supplement the missing data based on actual conditions before use
Technical purpose of product or process 该数据描述了一个矿井水处理站的运营情况,该站专门处理来自烟煤和无烟煤采矿活动的水。该工厂设计用于处理1.2至1000万吨/年的井下综合机械化采矿产出,在富水矿区内。部署在末端处理设施的物理化学处理技术对于移除化学需氧量、石油相关废物、汞和砷等污染物至关重要,以维持环境标准。
Classification
Class name : Hierarchy level
  • ILCD: Reference Parameters / Energy carriers and technologies / Hard coal based fuels
General comment on data set the Technical of end-of-pipe management technology for pollution arsenicisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
Copyright No
Owner of data set
Quantitative reference
Reference flow(s)
Technological representativeness
Technology description including background system the Technical of end-of-pipe management technology for pollution arsenicisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
LCI method and allocation
Type of data set Unit process, single operation
Data sources, treatment and representativeness
Deviation from data treatment and extrapolations principles / explanations None
Data source(s) used for this data set
Completeness
Completeness of product model No statement
Validation
Type of review
Dependent internal review
Reviewer name and institution
Data generator
Data set generator / modeller
Publication and ownership
UUID b5d78ca7-ac5c-4ff6-a47b-78fb1f02a213
Date of last revision 2024-04-15T22:09:46.295493+08:00
Data set version 00.01.005
Permanent data set URI https://lcadata.tiangong.world/showProcess.xhtml?uuid=b5d78ca7-ac5c-4ff6-a47b-78fb1f02a213&version=01.00.000&stock=TianGong
Owner of data set
Copyright No
License type Free of charge for all users and uses

Inputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Product flow
Materials production / Raw materials 1000.0 kg1000.0 kg
General comment nan

Outputs

Type of flow Classification Flow Location Mean amount Resulting amount Minimum amount Maximum amount
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 2.5499999999999997E-8 kg2.5499999999999997E-8 kg
General comment the Technical of end-of-pipe management technology for pollution MercuryisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
Product flow
Emissions / Other substance type 1.275E-4 kg1.275E-4 kg
General comment the Technical of end-of-pipe management technology for pollution Petroleum-related wasteisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management95,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
1000.0 1000.0
General comment the treatment technology for the pollution of Waste waterdidn't offered,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 0.004525 kg0.004525 kg
General comment the Technical of end-of-pipe management technology for pollution chemical oxygen demandisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management95,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)
Elementary flow
Emissions / Emissions to water / Emissions to water, unspecified 7.499999999999999E-6 kg7.499999999999999E-6 kg
General comment the Technical of end-of-pipe management technology for pollution arsenicisPhysicochemical treatment,Its Technical efficiency of end-of-pipe management85,The formula for calculating the actual operation rate (k-value) of the end-of-pipe treatment facility is k = normal operating time of treatment facilities (days/year) / normal production time of enterprises (days/year)