Key Data Set Information
|
Location
|
LN-CN
|
Geographical representativeness description
|
Liaohe Oilfield
|
Reference year
|
2017
|
Name
|
Mining process ; Raw coal, crude oil ; Oilfield oil and gas ; Drilling
|
Use advice for data set
| When utilizing this dataset for LCA, it is imperative to account for methodological considerations such as the scope of the system boundary, which should include all relevant drilling operations. Data users need to ensure the mining process data is relevant and current as of the time of publication, and to adjust for technological changes or efficiency improvements if applying it to different temporal contexts. Attention should be paid to the geographical specificity, as results may not be transferable to other regions without adjustments for local conditions. Further, when modeling the use phase behavior, variations in operational practices and maintenance regimes specific to the Liaohe Oilfield should be taken into account. |
Technical purpose of product or process
| This dataset describes the mining process specific to the extraction of raw materials like coal and crude oil from the Liaohe Oilfield. The data set is especially relevant for the analysis in the oil and gas sector, focusing on energy and water consumption as well as waste emissions during the drilling phase of the oilfield operation. The process is crucial for the supply of raw coal and crude oil as inputs for various energy generation and industrial applications. |
Classification
|
Class name
:
Hierarchy level
|
| Analysis of the working links of energy, water resources and other resources consumption, waste emissions and other indicators |
Copyright
|
No
|
Owner of data set
|
|
Quantitative reference
|
Reference flow(s)
| |
Time representativeness
|
Time representativeness description
| Time of publication |
Technological representativeness
|
Technology description including background system
| Drilling in the process of oil development is the construction process of oil Wells, workers use drilling tools and relevant technology to use the drill bit to drill underground, drill through the rock to the target layer. The drilling process includes a number of construction projects, and the use of site construction, drilling fluid configuration, discharge and oil production waste liquid discharge, etc., in the operation process will produce waste liquid, noise and solid waste and other pollution behaviors. |
Flow diagram(s) or picture(s)
| |