Owner of data set Tiangong LCI Data Working Group |
Technical purpose This industrial process is designed for in-situ groundwater remediation. The impermeable funnel, constructed of closed sheet piles or mud walls, is embedded within a groundwater barrier layer. It is specifically used to direct or funnel contaminated groundwater flow through a permeable reactive barrier (PRB), where it is treated with active materials to remove or neutralize pollutants. |