Process data set overview page

Data set: Caisson-based gate ; 2.4 m diameter caisson ; 1.2 m × 1.2 m column of ZVI ; In-situ groundwater remediation ; PRB ; Funnel-and-gate configuration PRB (00.01.005)

Full name
Caisson-based gate ; 2.4 m diameter caisson ; 1.2 m × 1.2 m column of ZVI ; In-situ groundwater remediation ; PRB ; Funnel-and-gate configuration PRB
Location
UM
Reference year
2009
Valid until
Reference flow(s)
Type
Unit process, single operation
Parameterized?
no
LCIA results included?
no
Category
Unit processes / Other Services / Repair and maintenance
Synonyms
Use advice for data set
Users of this dataset should be aware that the specific details of the construction and implementation of the caisson-based PRB system are based on design documents for Dover AFB and may not be universally applicable. When utilizing this data for other sites, ensure that local conditions are equivalent or adjustments are made to the design to accommodate different hydrological or geological situations. It is also essential to note that some unit processes, inputs, or emissions might be estimated or omitted based on available literature and calculations rooted in fundamental principles; therefore, further verification is recommended when applying the data in a new context.
Data set use approval
General comment
PRBs are installed in situ, allowing groundwater to flow under the natural gradient through a reactive cell where a reactive medium degrades or captures contaminants.
LCI Method Principle
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
  • Dependent internal review by
License and access conditions
Copyright
no
License type
Free of charge for all users and uses
Owner of data set
Tiangong LCI Data Working Group
Technical purpose
The described industrial process involves the use of a caisson-based gate configured as part of a Permeable Reactive Barrier (PRB) system. This system, incorporating a 2.4 m diameter caisson and a 1.2 m × 1.2 m column of Zero Valent Iron (ZVI), is specifically designed for in-situ groundwater remediation. The funnel-and-gate configuration of the PRB allows for the natural gradient flow of groundwater through the reactive cell, facilitating the degradation or capture of pollutants. This technology is implemented for environmental management and remediation at sites like Dover Air Force Base, where containment and treatment of contaminated groundwater are necessary.
Input Products
No records found.
Co-Products
No records found.
Data set version
00.01.005
Time stamp (last saved)
2024-03-25T15:36:42+08:00
Data set format
Compliance systems
No records found.
Tag
Registered in
Registry nameBase URLStatus