TianGong Life Cycle Data Network
Data stock: TianGong_V0.2.0 [ Download ]

Process data set overview page

Data set: Cable manufacture ; a total of 67.2 km submarine cable. (00.01.005)

Full name
Cable manufacture ; a total of 67.2 km submarine cable.
Location
SH-CN
Reference year
2009
Valid until
Reference flow(s)
Type
Unit process, single operation
Parameterized?
no
LCIA results included?
no
Category
Unit processes / Systems / Electrics and electronics
Synonyms
Use advice for data set
The LCA data provided for the DBOWF should be used with consideration for the unique conditions of an offshore wind farm. Users must take into account the transportation energy involved in shipping materials and equipment to the offshore site, which may differ significantly from onshore projects. Additionally, the installation energy and emission estimates are based on the specifics of the DBOWF's construction plan, and may not be reflective of other projects. The data concerning operation and maintenance come from direct site investigations and should be used to guide expectations for similar projects. Uncertainties present in the model parameters and input data that could impact the sensitivity analysis section should be carefully evaluated when applying this data to other contexts.
Data set use approval
General comment
The submarine cables manufactured for the Donghai Bridge Offshore Wind Farm (DBOWF) serve as conduits for electrical transmission from China's first offshore wind farm to the mainland power grid. They are specifically designed for underwater applications, ensuring stable and efficient energy transfer over long distances in a marine environment. The cables are integral to the wind farm's infrastructure and facilitate the generation of on-grid electricity by connecting wind turbines to the energy distribution network.
LCI Method Principle
Attributional
LCI Method Approaches
No records found.
Completeness of product model
No statement
Reviews
  • Dependent internal review by
License and access conditions
Copyright
no
License type
Free of charge for all users and uses
Owner of data set
Tiangong LCI Data Working Group
Technical purpose
The submarine cables manufactured for the Donghai Bridge Offshore Wind Farm (DBOWF) serve as conduits for electrical transmission from China's first offshore wind farm to the mainland power grid. They are specifically designed for underwater applications, ensuring stable and efficient energy transfer over long distances in a marine environment. The cables are integral to the wind farm's infrastructure and facilitate the generation of on-grid electricity by connecting wind turbines to the energy distribution network.
Input Products
No records found.
Co-Products
No records found.
Data set version
00.01.005
Time stamp (last saved)
2024-04-19T20:06:59+08:00
Data set format
Compliance systems
No records found.
Tag
Registered in
Registry nameBase URLStatus
GLADhttps://www.globallcadataaccess.org/
Data Set deregistration
Are you sure you want to deregister selected dataset?
Please enter the reason of deregistration and confirm.